← Application Production Support
06 / 6 · 35 MIN

RUN autonomy and continuous improvement

Turn operational gaps into acceptance, improvements, and project work.

Concept and mechanism

RUN handover should establish that the team can observe, diagnose, and recover the service within the agreed scope. Delivering slides or obtaining a signature does not establish execution. A controlled rehearsal by an authorized operator reveals access, documentation, and dependency gaps that the procedure author may overlook. Record results, limitations, and actions with deadlines and owners. If acceptance is conditional, identify the authority accepting risk and temporary coverage. Criteria should follow the service and its criticality without automatically copying another organization process. This course teaches decisions; it does not establish that a lab or actual recovery has been executed.

Guided application

Reserve improvement work to reduce repeated tasks and address obsolescence. Eight minutes twelve times a day equals ninety-six daily minutes: compare removing the cause, automating, and retaining the procedure, including risk and maintenance. In a decommissioning project, a host without monthly traffic can have a quarterly job. Confirm cycle, owner, alternative, retention, and recovery before removal. Measure associated costs, including volumes and licenses, instead of declaring zero cost merely because the host stopped. For a dependency approaching end of support, gather inventory, risk, effort, and window to feed planning. This allows the 25% project allocation to address causes that keep consuming the 75% support allocation.

IN PRACTICE

RUN without log access lacks demonstrated autonomy; a quarterly resource is not proven unused by one idle month.

Common pitfalls

Signature as capability; automation without maintenance; CPU-only decommissioning; support deadline without an owner.

Related topics: The service, impact, and ownership · Measure what the user receives · Incidents, communication, and shift change

Take this idea with you

Deliver operational capability and turn repeated effort into verifiable improvements.

Create account

Reference: OPS07-BP03: Use runbooks · DR APS professional curriculum 2026-09; vendor-neutral operational guidance reviewed 2026-09-30