Concept and mechanism
Capacity is more than nominal connection bandwidth. It includes supported packet size, available quotas, concurrency, destination, and failure behavior. In detailed Direct Connect guidance, transit VIF supports jumbo MTU of 8500 bytes; do not generalize the private VIF’s 9001 limit.
Confirm every segment before sending larger packets. For expansion, inspect quotas actually allocated to the account and Region. A public default may differ from your account’s value, and an adjustable limit does not mean an increase is already approved.
Allow time to request capacity and verify availability before the implementation window.
Guided application
A failover rehearsal should measure the operation on the surviving path. If BGP converges but the batch misses its deadline because of saturation, functional resilience still has a gap. Define load, duration, stop signals, and return to initial state.
For cost, add resources, transfer, observation, and operational effort across the complete design. Savings of 180 with additional costs of 230 and 40 represent a net increase of 90, using fictional values. Do not announce a reduction by counting only retired equipment.
Finally, preserve tool limitations: for TCP analysis crossing a TGW route table, documentation limits analysis to the forward direction. Verify return paths and functional recovery separately.
Workshop: two objectives and a complete calculation
The fictional scenario allows 15 minutes from failure to deliver 120 decimal GB. Routing recovers in 30 seconds and measured payload on the surviving path is 100 MB/s. Calculate completion time before reading the answer.
Transfer takes 120,000 MB / 100 = 1200 seconds, plus 30 for convergence: 20 minutes and 30 seconds. The 90-second network RTO passed, but the batch deadline failed. Only 870 seconds remain after convergence; the theoretical minimum is about 137.93 MB/s before headroom and must be measured on the actual path.
Do not substitute nominal connection speed. The expansion proposal saves €180/month and adds 230 for transfer and 40 for observation: total cost increases by €90/month. These are teaching assumptions, not AWS prices.
Before booking the window, confirm effective quotas, MTU compatibility, return routing and a representative batch repetition. Forward TCP analysis through TGW does not itself close return validation. Document routing, functional deadline, available capacity and complete cost separately.
The alternative route exists but supports only half the required load. The plan needs additional capacity or an approved degraded mode.
Common pitfalls
Adjustable quota as immediate; route as SLA; partial savings; forward analysis as proven return.
Related topics: Encryption and DNS controls · Inspection, auditing, and retirement
Measure the surviving service and present total cost with assumptions.
References
- ANS-C01 domain 3 · ANS-C01
- Direct Connect virtual interfaces · AWS documentation reviewed 2026-10-12
- VPC quotas · AWS documentation reviewed 2026-10-12
- Direct Connect resiliency toolkit · AWS documentation reviewed 2026-10-12
- Reachability Analyzer model and limits · AWS documentation reviewed 2026-10-12