Concept and mechanism
An IT project should connect a need to outcomes that someone can recognize and accept. Start by identifying sponsor, users, service owners, and who decides changes to scope, budget, and schedule. Distinguish the delivered product from the expected benefit: installing a platform does not demonstrate faster closing or more autonomous support.
Define boundaries, exclusions, assumptions, and dependencies. Acceptance criteria should specify outcome, evidence, and ownership, including relevant nonfunctional requirements. PM² is a public reference for organizing these decisions; its structure should be tailored to context and does not represent any bank internal rules.
Guided application
In a fictional reporting migration, the initial request is to move the application to cloud. Ask which problem this solves, which flows and consumers are included, and how correctness, performance, and recovery will be demonstrated. Include runbook updates and support training in scope instead of leaving them implicit.
A business case explains the investment rationale; the mandate and plans make the commitment executable. Combine formal reviews with incremental delivery when this enables earlier learning. Adopting agile practices does not remove acceptance ownership, funding decisions, or conditions for moving to the next phase.
Build an acceptance matrix
Connect each required outcome to a check, owner, and evidence. A simple matrix can separate integration, recovery, and training. If integration passed, recovery failed, and training was not observed, preserve all three states.
Failure needs correction or an applicable decision; absent evidence needs demonstration before concluding. Do not calculate a majority among criteria when every criterion is mandatory. Final sign-off should reflect actual outcomes, including conditions and actions, rather than merely document existence or effort already spent by the team.
Resolve conflicting boundaries
In a fictional prototype, scope excludes data older than two years while a mandatory query requires five. The PM should expose the contradiction before the final solution is built. Compare alternatives such as separate historical access or authorized scope change, and identify cost, operations, and acceptance impacts.
Signing two incompatible texts does not make both executable. Avoid changing only the test to obtain apparent success. When the business representative changes, revisit these commitments and confirm who has authority to accept.
Practice: conclude only within the evidence
Use the matrix below to write the recommendation. Identify what passed, what failed, and what remains unknown without turning those states into an overall success percentage. Then apply the same reasoning to a hundred-small-file test: its result does not establish behavior for large files and multilingual names.
At work, request representative classes from agreed flows and retain the sample’s scope. Finish with the required decision, the owner producing missing evidence, and the deadline for reassessment.
Synthetic acceptance matrix / Matriz fictícia
integration = passed
recovery = failed
training = unknown
all_required = true
acceptance_demonstrated = false
failed_checks = [recovery]; missing_evidence = [training]Deliverable: installed platform. Acceptance: reconciled flow. Benefit: measured reduction in closing time.
Common pitfalls
Cloud as a sufficient objective; implicit scope; acceptance without evidence; agility as absence of governance.
Related topics: Capacity, dependencies, and forecasting · Risk, change, and architecture decisions · Governance, suppliers, and communication
Connect objective, deliverable, acceptance criterion, and benefit owner.
References
- PM² Project Management · PM² methodology page; v3.1 guide listed, 2025 full guide marked coming soon
- PM² Artefacts · Artefact catalogue inspected; v3.1 files listed December 2025
- PM²-PM Highlights · 2025 edition v1.0;14-page primary PDF inspected through reader
- PM²-Agile · Official methodology overview; guide v3.0.1 listed
- The evolving SRE engagement model · SRE book chapter; contextual example rather than mandatory local process
- Defining reliability targets · Rolling Well-Architected guidance
- Safe deployment practices · Updated 2026-06-17; rolling guidance
- Implement a decommissioning process · COST 04-BP 02 rolling Well-Architected guidance
- Forecasting capability · Rolling framework guidance